Example Plans

DelDOT Design Resource Center Example Highway Plans

Forebay Spillway Detail

ForebayDetail.jpg

Inspection Port Detail

Inspection Port Detail.png

SWM Facility Signage Detail

  1. These signs need to be added to the plans for any SWM facility that does not have a dedicated outlet structure, i.e. infiltration trench, bioswale, etc.
    1. A bioswale will have a “Mow Line” sign at the upstream and downstream ends as well as the “BMP” sign (with assigned BMP #) needs to get installed on the same signpost as the upstream “Mow Line” sign.
    2. For any facility that does not have a dedicated outlet structure, the “BMP” sign (with assigned BMP #) needs to get installed next to the facility.
SWM Facility Signage.png